The fourth ring road in Wuhan crosses the Yangtze River on the Qingshan Bridge. The main bridge is 1.638 kilometers long, the south bank approach bridge is 2.442 kilometers long, and the north bank approach bridge is 3.468 kilometers long.
Solutions
Equipment | Quantity | Employed for | ||
1000T Synchronous lifting and lowering system | 68 | Launching | ||
PLC System | 34 | Incremental launching | ||
PLC System | 34 | Synchronous lifting control | jack | |
2000T Cylinder | Hydraulic | 16 | Assembly supporting | |
PLC System | 8 | Supporting Jacks | ||
2000T Cylinder | Hydraulic | 16 | Synchronous control | |
800T Cylinder | Hydraulic | 56 | Deviation correction | |
PLC System | 14 | Deviation correction | ||
PLC System | 14 | Jacks synchronous control | ||
500T Cylinder | Hydraulic | 4 | Lifting launcher | |
PLC System | 2 | Supporting | ||
PLC System | 2 | Synchronous lifting control | jack |