HL-Kattor.Heavy Duty Transportation Integrated Solution Provider

  • Project : Wuhan Qingshan Yangtze River Bridge
  • Service :
  • Date : 11 Aug, 2023
  • Status :

Project Description

The fourth ring road in Wuhan crosses the Yangtze River on the Qingshan Bridge. The main bridge is 1.638 kilometers long, the south bank approach bridge is 2.442 kilometers long, and the north bank approach bridge is 3.468 kilometers long.

Solutions

Equipment

Quantity

Employed for

1000T Synchronous lifting and lowering system

68

Launching

PLC System

34

Incremental

launching

PLC System

34

Synchronous

lifting control

jack

2000T

Cylinder

Hydraulic

16

Assembly

supporting

PLC System

8

Supporting Jacks

2000T

Cylinder

Hydraulic

16

Synchronous control

800T

Cylinder

Hydraulic

56

Deviation correction

PLC System

14

Deviation correction

PLC System

14

Jacks synchronous

control

500T

Cylinder

Hydraulic

4

Lifting launcher

PLC System

2

Supporting

PLC System

2

Synchronous

lifting control

jack


Project Images

Go To Top
0.0670s