HL-Kattor.Heavy Duty Transportation Integrated Solution Provider

  • Project : Daishan Island Wind Power Base Beam trolley on rail sleepers
  • Service :
  • Date : 11 Aug, 2023
  • Status :

Project Description

Daishan Island Wind Power Base CCCC 3rd Harbor Engineering Company. The machinery was specifically used to move tower components, turbine sets (blades and hubs), wind turbine generators, and other 4mW, 5mW, and 6mW wind power components.

Technical parameters

Capacity

Active trolley/ Passive trolley

Running Speed

0-15.4m/min

Power

92kW

Weight

83t


Project Images

Go To Top
0.0559s